Subfloor prep first
Uneven or damaged subfloors cause problems with any flooring type. We level and repair the subfloor before installation, not after issues show up.
Hardwood, LVP, tile, and carpet
Whatever flooring you've chosen, we install it correctly — including proper transitions between rooms and material types.
Removal of old flooring included
Tear-out and disposal of your existing flooring is part of the job, not a separate line item that surprises you later.
Clean, precise finish work
Baseboards, transitions, and edges finished properly so the new floor looks intentional, not patched in.
Ready to start your project? Get a free estimate.
Tell us what you're planning and we'll come measure and give you a real number.
Call (573) 222-5937Questions about flooring installation in Cape Girardeau
Do you remove the old flooring?
Yes, tear-out and disposal is included in the installation.
What if my subfloor is uneven?
We level and repair subfloor issues before installing new flooring — skipping this step causes problems later.
How long does flooring installation take?
Most single-room installs take one to two days; whole-home projects take longer depending on square footage.
Related services
Get a free remodeling estimate
Want to talk it through now? Call (573) 222-5937. Prefer to send details? Fill this out and we'll get right back to you.